ESKISEHIR
Which route do you prefer in tram lines?
Otogar-SSK
Otogar-OGU
Otogar-Opera
OGU-SSK
OGU-Opera
Servey Results

   In 2004, in order to provide a high capacity, fast and efficient transportation; and also aiming to reduce mess of traffic and air pollution; the Eskisehir light rail transit system, the first transportation line in Turkey to use 100 per cent low-floor Bombardier FLEXITY Outlook trams,

opened to passenger service. The complete network is designed to carry passengers at a top speed of 50 km/h in mixed traffic although they are capable of reaching speeds up to 70 km/h. The project was completed in less than two years and was awarded by UITP (International Association of Public Transport) in 2004 in recognition of its actions in favor of Light Rail.

NEWS
 09 June 2008
   ESTRAM IS CONTINUING TO ADVANCE THROUGH IT’S VISION
    Estram , whose vision is being a model for tram enterprises in Europe, obtained first-class honors from the members of UITP (International Association of Public Transport). Prof. Dr. Ing-Wolfgang
 Complete article...

 11 July 2007
   ESTRAM HAS BEEN CERTIFIED WITH TS-EN ISO 9001:2000 Q.M.S.
    In order to provide continuity of the effective and adequate service it provides to residents of Eskisehir, ESTRAM has completed its studies about ISO 9001:2000 Quality Management System which is base
 Complete article...

 4 May 2007
   ESTRAM is set as a model.
    The representatives from different cities of Turkey, which have studies about rail transit systems, have participated “Track Engineering and Maintenance Seminar” by Eskisehir Metropolitan Municipality
 Complete article...

 24 April 2004
   International Award for ESTRAM
    ESTRAM project which was constructed by Yapi Merkezi – Bombardier Consortium was awarded by International Association of Public Transportation with 2004 Rail System Award. Yapı Merkezi - Chairman of t
 Complete article...

Total Visitor : 425439  
estram.com.tr © 2006  WebDesing estram